Golon Inc | Commercial Contractor
(412) 885-6061

Parking Garage Repair General Contractor Commercial Rennovations Commercial Construction


CCAC Boyce Campus Pedestrian Bridge


CCAC Boyce Campus Pedestrian Bridge

Golon, as the General Contractor, completed the demolition and rebuild of a pedestrian bridge, spanning over 60' at CCAC's Boyce Campus. Golon removed the existing concrete and steel and then sand blasted the existing girders. After repainting the girders with an epoxy paint, Golon reinstalled new beams and a poured the concrete walkway slab. Within the slab is a snow melt system that automatically comes on when freezing precipitation and snow is experience. This project also included asbestos abatement, new electric systems and lighting, and the interior renovation of the corridor area.

Contact Golon Inc.








Which office would you prefer: PA OH


CCAC Boyce Campus Pedestrian Bridge Construction Gallery by Golon Inc.

Project Portfolio: Featured Construction Projects by Golon Inc.

prev
  • Mellon Square Parking Garage – P...

    Golon, as the General Contractor, completed the demolition and rebuild of a 6-story stair tower within the parking garage. Golon reinstalled new stair...
    Full Article

  • CCAC Boyce Campus Pedestrian Bridg...

    Golon, as the General Contractor, completed the demolition and rebuild of a pedestrian bridge, spanning over 60' at CCAC's Boyce Campus. Golon...
    Full Article

  • Washington County Health Center En...

    Golon, as the General Contractor, completed the construction of an entrance canopy at the Washington County Health Center. The work included all build...
    Full Article

  • Nottingham Township Public Works D...

    Golon, as the General Contractor, completed the construction of two single story, slab-on-grade, masonry building additions, constructed at the Public...
    Full Article

  • Pine Township Salt Storage Facilit...

    Golon, as the General Contractor, teamed up with Atlantic Engineering Services, for the design and construction of a 216' x 80' salt storage...
    Full Article

  • Port Columbus International Airpor...

    Golon, as the General Contractor, completed the over 20,000 square feet of tarmac concrete removal and replacement, varying from 10”-24” thick. In...
    Full Article

  • Redevelopment Authority of Washing...

    Golon, as the General Contractor, completed the construction of thirteen offset and staggered, individual patio homes in blocks of four and five units...
    Full Article

  • Gaucho Parrilla Argentina Restaura...

    Golon, as the General Contractor, completed the entire build out for the award-winning Gaucho Parrilla Argentina restaurant on Penn Ave in Pittsburgh,...
    Full Article

next